A LITERATURE REVIEW: ANALYSIS OF DIFFERENT PROJECTS FOR TIMELY COMPLETION OF CONSTRUCTION PROJECTS

    2 Author(s):  GYANENDRA P.S. GAUTAM, PROF. M.C.PALIWAL

Vol -  9, Issue- 4 ,         Page(s) : 38 - 42  (2019 ) DOI : https://doi.org/10.32804/RJSET

Abstract

The timely completion of any construction project is no doubt one among the most vital aspects for any project manager. The involvement of numerous different type and nature of works, and hundreds or many times thousands of numbers of activities make it a very sophisticated job to perform. Since most of the activities are interrelated, the importance of every single activity is to be understood well. It is therefore very important to consider all the possible factors that would directly or indirectly affect the progress of the project. After having studied the research done earlier, the following major problems were identified that were responsible for late completion of project - late approval of material samples, slow decision making, delayed approval & revision of drawings, change orders in the design during the course of work, poor communication and coordination, excessive mistakes & discrepancies in good for construction drawings provided by the consultant, poor communication & coordination between parties and lack of use of latest planning tools like MS Project and Primavera.

1. Raji Al-Ani & Firas I. Al-Adhmawi, Implementation of Quality Management Concepts in Managing Engineering Project Site, Jordan Journal of Civil Engineering, Vol. 5 No.1, 89-106, 2011
2. B. Ali S. Alnuaimi & Mohd. A. Al Mohsin, Causes of Delay in Completion of Construction Projects in Oman, ICIET, 267-270, 2013
3. C. Amit A. Mahadik & Prasad R. Kashid, Necessity of Quality Control in Construction Industry, Indian Journal of Research, Vol. 3, Issue 4, 106–107, 2014
4. D. Aswathi, R., & Thomas, C., Development of a Delay Analysis System for a railway construction Project, IJIRSET, Vol.2 Special Issue 1, 531–541, 2013
5. E. Owolabi James D. & Amusan Lekan M., Causes And Effect Of Delay On Project Construction Delivery Time Construction Project Deliveries, Vol. 2, Issue 4, 197-208, 2014
6. F. Desai, M., & Bhatt, R., Critical Causes of Delay in Residential Construction Projects : Case Study of Central Gujarat Region, IJETT, Vol. 4, Issue 4, 762–768, 2013
7. G. Dinakar, A., Delay Analysis in Construction Project, Vol. 4, Issue 5, 784–788, 2014
8. H. Hamzah, N., Khoiry, M. A., Arshad, I., Badaruzzaman, Identification of the Causes of Construction Delay in Malaysia,IJCESCAE, Vol. 6, Issue 12, 104–109, 2012
I. Jha, K. N., & Iyer, K. C. (2006). Critical Factors Affecting Quality Performance in Construction Projects, Total Quality Management, Vol. 17, Issue 9, 1155–1170, 2006
9. J. KL Ravishankar, Dr. S. Ananda Kumar & V Krishnamoorthy, A Study On Quantification Of Delay Factors In Construction Industry, Ijetae. Vol. 4, Issue 1, 105-113, 2014
10. K. Kolhe, R., & Darade, M., Detail Analysis of Delay in Construction Projects, IJISET, Vol. 1 Issue 10, 70–72, 2014
11. L. Dhanashree S. Tejale & Dr.SD Khandekar, Analysis of Construction Project Cost Overrun by Statistical Method, IJARCSMS, Vol. 3, Issue 5, 349–355, 2015
12. M. Tom, A. F., & Paul, S., Project Monitoring and Control using Primavera, IJIRSET, Vol. 2, Issue 3, 762–771, 2013
13. N. Meena V. & K. Suresh Babu, Study on Time Delay Analysis for Construction Project Delay Analysis, Vol. 4, Issue 3, 1076–1083, 2015