ANALYSIS PSO BASED FUZZY SYSTEM AND ANALOGY-BASED HYBRID SOFTWARE COST ESTIMATION PROCESS
2
Author(s):
DR.S.PAVANI ,DR.KAJAL KIRAN GULHARE
Vol - 13, Issue- 2 ,
Page(s) : 27 - 36
(2023 )
DOI : https://doi.org/10.32804/RJSET
Get Index Page
Abstract
The number of software projects that are being worked on in today's modern software business has been on the rise. Because of the growing size and scope of these types of projects, it is now essential to carry out an accurate requirement analysis at an early stage in the development of the project in order to carry out a cost-benefit analysis.
|